Upcoming Runs Timeline¶
The Test Suites page includes an Upcoming Runs timeline at the top, showing which Test Suites are scheduled to run in the near future. It follows the Projects filter, and its Refresh icon reloads it.
Choosing the time window¶
You can choose how far ahead to look: 4h, 8h, 12h, 24h, or 48h. The default is 24h; when that would show more than 25 runs, the timeline starts with a shorter window. The timeline updates to show all upcoming runs within the selected range. When nothing is scheduled, it reads "No scheduled runs in the next Nh".

Each suite has its own colour. A run is drawn as a band as long as the suite's estimated duration; hover over it to see the suite, the start time with its time zone, and the estimated duration (~). Hatched areas mark possible schedule conflicts.
Note
Use a shorter window (such as 4h or 8h) to focus on runs happening soon, or a longer one (24h or 48h) to plan ahead across the day.